Understanding Hourly True RMS Power Measurements
This technique uses a data logger to take long-term measurements of the electrical energy (kWh) and power draw (kW) of a system or component at one-hour intervals. Measurements are taken at the electrical distribution system (specifically at a panelboard, power panel, or switchgear) that serves the system or component. Measurement data is used to estimate the annual energy consumption of the system or component.
Data loggers and power meters use instantaneous measurements of current and voltage to calculate the instantaneous power draw. Over time, the logger or meter calculates the average power draw. Manufacturers of measurement equipment use different calculations for power draw. In order to compare data obtained from different measurement equipment, it is important to understand the calculation used by the equipment. The manufacturer’s user manual or technical specifications discuss these features in detail.
The duration of the long-term measurement and when to measure is dependent on the system and the operation of the building. Best practice is to collect the data for a minimum of six weeks at one-hour intervals; longer measurement periods are encouraged for deeper analysis of the equipment. Measurements should be taken when the system or component is operating under normal conditions.
Type of Measurement
Electrical energy measurements are direct measurements of energy, and the obtained data can be used to calculate the annual energy consumption of the system or component.
This methodology can also be used as a proxy measurement of operational hours of the system or component. Daily or weekly models can be developed to better characterize the equipment.
Measurement Equipment
The measurement equipment needed for this procedure is an energy data logger that has the capacity to measure AC voltage and current.
The sensors used to measure AC current are known as current transformers. This is because they operate like the transformers used by utility companies to step-up and step-down voltage. Alternating current in the conductor (the wire that is being measured) induces a voltage on the current transformer, which then produces a current signal that the data logger detects and records. However, unlike utility transformers, the measurement equipment only transforms a tiny portion of the current flowing through the wire that is being measured. AC voltage is measured with voltage leads (usually alligator clips).
This measurement technique makes use of the following equipment available in the Field Equipment Lending Library:
Enegry Data Logger Equipment
Provides a measurement of true RMS power from voltage and current inputs and records long-term power (kW) and energy (kWh) measurements. Requires ELOG19 software and a USB connection cable for programming and downloading data files.
Measurement Steps
1. Prepare for Data Acquisition
The following sections assume a data logger is being used. For details on measurement with a power meter, refer to the One-time true RMS power guide.
Use the manufacturer’s software to set up and launch the logger(s). Refer to the equipment’s user manual for detailed instructions on how to set up the logger.
- Logging interval: 1-hour
- Date and time to start logging
- Date and time to stop logging
- Values to measure: Power (kW), Energy (kWh)
An example of how to set up the Dent EliteProXC power data logger is shown in the video below.
2. Install Equipment
- Confirm that the equipment is operational.
- Determine whether the distribution system supplies electricity to any unrelated loads to avoid measuring unintended energy consumption.
- Identify the wiring configuration of the distribution system. This will determine how to set up the logger and sensors.
- Clamp the sensors around the electrical wires. Make sure they are facing the right direction, or the current may be recorded with negative values.
- Based on the wiring configuration and instructions from the equipment’s user manual, install the sensor and logger to measure the power and energy to the system.
This section illustrates the most common wire configurations for a panelboard and how the Dent EliteProXC data logger is connected.
3. Verify Data is Being Collected
Wait 24-48 hours to verify data collection. Return to the location of the measured equipment and use a laptop or a phone with the manufacturer’s proprietary software installed to do the following:
- If necessary, connect the logger to a laptop or phone via USB cable. Otherwise, use the software to connect with the data logger via Bluetooth.
- Analyze the data with a plot graph. This can be done with the proprietary software or Microsoft Excel after exporting the dataset as a .csv file.
- Determine whether the results align with the expected operation of the system or component based on observed operational patterns or known equipment schedules.
4. Retrieve Measurement Equipment and Download Data
After verifying that the logger is collecting data, do the following:
- Allow the logger to collect data for the remainder of the measurement period.
- After the measurement period has concluded, remove the logger from the panel.
- If necessary, connect the logger to a laptop or phone via USB cable. Otherwise, use the software to connect with the data logger via Bluetooth.
- Use the proprietary software to stop the logger and end data collection.
- Download all data from the logger and save the file in the .csv file format for analysis.
5. Process and Analyze Measured Data
Use the collected measurement data in the corresponding calculator file based on the type of component you are measuring:
Heat Exchangers
Fan and Motor
Pump and Motor
Compressor and Motor
Electrical Distribution
Troubleshooting
Unexpected Negative Readings
Confirm that all current transformers (CTs) are facing the correct direction.
Unexpected Low Values
Confirm that the current rating for the electrical distribution system is within the range of the current rating for the CTs.
CTs Do Not Fit in Panelboard Casing
If it is safe to do so, trace the wires outside the panel board and install the sensors there. If this is unsafe or not possible to do, consider following an alternative approach of measuring current to the system with either instantaneous true power or nameplate data as a proxy for total power draw and energy consumption.